| 1. | Temporary loading of 1 2 percentage point 暂时性加征半个百分点 |
| 2. | Temporary loading condition 临时荷载条件 |
| 3. | This paper gives the oondition about the veinforced - concrete beams to calculate and analyse the flexural mechanical capability unted temporary loads 给出了钢管混凝土构件的计算条件,对构件在临时荷载作用下受弯的力学性能进行了分析和计算。 |
| 4. | Two temporary loading and unloading locations will be provided at tsing lun road westbound outside tuen mun hospital and tsing chung koon road northbound opposite to tuen mun hospital 青麟路西行屯门医院外及青松观路北行屯门医院对面将增设两个临时上落客点。 |
| 5. | Temporary loading and unloading areas will be prohibited from 7 am and 12 midnight between december 13 and 15 . depending on the number of participants , police will implement a queuing system 在临时上落客货区以外的地方,将划为禁区,由十二月十三至十五日期间,每日由上午七时至凌晨十二时,禁止车辆停泊。 |
| 6. | Abstract : the calculation method of temporary load of the continuous carrier bar with different distance span was discussed . the length calculation in design of the pressure bearing bar with the different distance span which has to be worked out can be done by means of this method , thus making the structure design in construction more accurate and convenient 文摘:讨论了不跨连续压杆的临时荷载计算方法,应用该方法可以解决不跨受压杆件设计中必须解决的长度计算问题,从而使施工结构设计更为准确简便 |
| 7. | The calculation method of temporary load of the continuous carrier bar with different distance span was discussed . the length calculation in design of the pressure bearing bar with the different distance span which has to be worked out can be done by means of this method , thus making the structure design in construction more accurate and convenient 讨论了不跨连续压杆的临时荷载计算方法,应用该方法可以解决不跨受压杆件设计中必须解决的长度计算问题,从而使施工结构设计更为准确简便 |